The new culvert is now in place and carrying Smith Creek water away from Elizabeth Lake. The photos show it in location. The other photo shows the condition of the old plugged culvert which was removed. It looks as though it was ready for removal anyway due to its condition and the material plugging the inside. The new culvert should be MUCH easier to keep clear of debris.
Dave
0 Comments
The first of the three sections of new culvert had been placed and the workers were getting close to placing the second section. At that speed it looks as though the culvert will be all installed by the end of the workday. Sorry about the quality of the photo which had to be taken directly into the sun!